Northwood Crossing

Click here to see a picture of the crossing.

The type of crossing to be installed here was being considered in 1974, the crossing being operated at that time by handsignalling. Initially a gated crossing was proposed but by 1977 an open crossing was the favoured option and an 'Open Crossing Locally Monitored' (AOCL) was commissioned on 5 July 1980.

Arley -- return to main page -- Bewdley North.