Eardington

Click here to see a picture of the ground frame.

In 1972 a loop was being constructed at Eardington as the debate over the future of Bridgnorth grew more heated, culminating in a strike of the volunteers in 1973. A ground frame to give access to the permanent way siding that remained was commissioned in 1976 and is unlocked by the Highley-Bridgnorth token. The first train called at Eardington Halt on 7 March 1981 but the halt was subsequently closed.

Bridgnorth -- return to main page -- Hampton Loade.